Inner Belt Loop

ExcavationInner Belt Loop This project will construct a road from near the terminus of Wicks Lane near Harvest Church to the intersection of Zimmerman Trail and Highway 3. The Inner Belt Loop will be constructed as a 2-lane rural roadway with ditches and a multi-use path along one side. The length of the project is approximately 6 miles. New intersections will be constructed at Wicks Lane and Alkali Creek, with the intersection of Zimmerman Trail and Highway 3 being reconstructed. Storm drainage along this corridor will be handled via culverts and ditches.

The construction of the Inner Belt Loop will be built in phases. Phase 1 of the Inner Belt Loop will construct the roadway from Wicks Lane to Alkali Creek Road. Phase 1 was bid in September 2013 and construction is anticipated to be complete by May/June 2014.