Shiloh Road (Poly to Rimrock)

The City of Billings reconstructed Shiloh Road from Poly Drive to, and including, Rimrock Road. The project included:
  • Five-lane roadway
  • Curb
  • Gutter
  • Sidewalk
  • Shared-use path
  • Traffic signal at Rimrock and Shiloh
  • School crossing at Poly Drive
  • Minor utility improvements
Construction plans for the project were developed by Engineering, Inc. These plans are available for viewing at the City Engineer's Office or at the offices of Engineering, Inc.

Project Cost
Based on preliminary estimates, the cost of the project was in the range of $1.4 to 1.8 million. The City of Billings intended to contribute approximately $2.01 million towards construction costs (including construction administration).